Completion of CRPO 121 with Blue Steel and Diving Scope
Ian Tyndale Biscoe
2/11/20261 min read


Blue Steel completes CRPO 121 monel sheath removal diving in Manifa field.
In January, Blue Steel received Aramco RMM and SIRU approval to conduct monel sheath removal on 9 jackets in Manifa field.
The challenges with the temperamental weather for this time of year, many shamaals had to be avoided by taking port call shelter. Aramco work permit system, seasonal fog also contributed to a staccato flow of progress.
However, the boat, crew, client representatives and diving team displayed great resilience and fortitude. With determination and positivity, all challenges were overcome, the project was completed successfully, and above all, safely.






Copyright © 2025 Six Alliance Co. Ltd. All rights reserved.
Powered by www.BitnextDigital.com
Contact Us
Phone
+966-53-202-5363
Offices
Singapore
352 Tanglin Road, #01-01 Singapore 247671
Tel: +65-9781-6786
Kingdom of Saudi Arabia
Road 114 Industrial Area No. 1
Al Jubail, Saudi Arabia 35717
Tel: +966-53-202-5363
