Completion of CRPO 121 with Blue Steel and Diving Scope

Ian Tyndale Biscoe

2/11/20261 min read

Blue Steel completes CRPO 121 monel sheath removal diving in Manifa field.

In January, Blue Steel received Aramco RMM and SIRU approval to conduct monel sheath removal on 9 jackets in Manifa field.

The challenges with the temperamental weather for this time of year, many shamaals had to be avoided by taking port call shelter. Aramco work permit system, seasonal fog also contributed to a staccato flow of progress.

However, the boat, crew, client representatives and diving team displayed great resilience and fortitude. With determination and positivity, all challenges were overcome, the project was completed successfully, and above all, safely.

Copyright © 2025 Six Alliance Co. Ltd. All rights reserved.

Powered by www.BitnextDigital.com

Contact Us

Email

Phone

+966-53-202-5363

Offices

Singapore

352 Tanglin Road, #01-01 Singapore 247671

Tel: +65-9781-6786

Kingdom of Saudi Arabia

Road 114 Industrial Area No. 1

Al Jubail, Saudi Arabia 35717

Tel: +966-53-202-5363